
Still Scheduling Jobs on a Whiteboard or Spreadsheet?
Epicor Kinetic gives job shops and make-to-order manufacturers finite capacity scheduling, real-time work order visibility, and shop floor execution — all in one system.
Your Scheduling Tool Is Lying to You
Most scheduling tools — and every spreadsheet — assume infinite capacity. They tell you a job is due Friday without knowing whether your CNC is already booked, your key operator is on vacation, or a rush order just jumped the queue.
The result is missed delivery dates, overtime costs, and a production manager who spends more time firefighting than planning. Epicor Kinetic’s Advanced Planning and Scheduling (APS) module uses your real resource constraints to build a schedule that actually holds.

What Epicor Kinetic Does for Your Shop Floor
Finite Capacity Scheduling
Schedule jobs based on the actual availability of your machines, work centres, and operators. No more infinite-capacity assumptions.
Real-Time Job Tracking
Know the status of every open work order at a glance. Operators log time and completions directly from the shop floor terminal.
What-If Scenario Planning
Define FAI and in-process inspection plans at the operation level. Kinetic enforces inspection checkpoints before a job can move to the next stage — no bypassing allowed.
Accurate Delivery Dates
Quote realistic delivery dates based on your current load. Stop promising dates you cannot keep and start winning on reliability.
Labour and Machine Efficiency
Track OEE and labour efficiency by work centre. Identify bottlenecks and make data-driven decisions about where to invest.
Integrated Material Planning
Scheduling is linked to your MRP. When a job is scheduled, material requirements are automatically calculated and purchase orders triggered.
Epicor Kinetic APS vs. Spreadsheet Scheduling
|
Capability
|
Epicor Kinetic APS
|
Spreadsheet / Basic ERP Scheduling
|
|---|---|---|
|
Capacity Awareness |
✓ Finite — uses real machine and labour hours |
✗ Infinite — assumes unlimited capacity |
|
Rush Order Impact |
✓ Instant what-if simulation |
✗ Manual recalculation, hours of work |
|
Shop Floor Visibility |
✓ Real-time from operator terminals |
✗ Requires manual floor walk |
|
Material Linkage |
✓ Integrated with MRP and purchasing |
✗ Separate process, prone to errors |
|
Key-Person Dependency |
✓ System-driven, anyone can manage it |
✗ One person holds all the knowledge |
Average Reduction in Late Deliveries After Kinetic APS Implementation
Successful Epicor Implementations by EC Solutions
Years of Manufacturing ERP Expertise in Canada
“We went from scheduling in Excel to having a live Gantt chart that updates the moment an operator clocks off a job. Our on-time delivery rate went from 72% to 94% in the first six months.”
Custom Job Shop, Quebec
See Finite Scheduling Built for Your Shop
Our consultants will walk you through a live scheduling demo using scenarios from your industry. See exactly how Kinetic handles rush orders, machine breakdowns, and shifting priorities.
Address
1100 René-Lévesque Blvd W, Montreal, Quebec H3B 4N4
Phone
866-959-4153
Book My Free Scheduling Demo
Get a personalised Epicor Kinetic scheduling demo within 1 business day.